action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Barrientos Design completed the design of this 76,000 square foot Highway Maintenance facility located at a new site that previously functioned as a gravel quarry. Barrientos Design was hired to develop a complete site master plan to delineate all the ultimate facilities on the site over a three-year period.
Site functions include: operations building, salt dome, fueling station, compost pad, outdoor stock pile storage, equipment storage buildings, truck scales and asphalt plant machinery layout areas.
Building functions include: 7 vehicle service bays, steam wash bay, welding shop, sign shop, tire storage, fluid storage, parts storage, steel storage, lunchrooms, locker rooms and administrative offices.
Size: 76,000 SF
Cost: $8.2M
Completion: 2002