goodlayers-core
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114We are happy to see our newest building be completed and go online. The County of La Crosse hired Barrientos Design to design their new Highway Garage facility located in the center of the county. This facility will allow the county to better position their fleet of heavy trucks so they can cut the amount of time it takes to respond to snow and traffic emergencies in half.
The main portion of the building is a tall and wide truck storage facility that is fully equipped with compressed air and water reels so vehicle operators can prep their vehicles at the end of their runs.
The new building also has a wonderful truck washing facility for large and heavy road vehicles, allowing the La Crosse fleet to be washed quickly and thoroughly.
Our team was faced with a steep site and there will be no utilities for building services. However, with creative draining and onsite site wells, we were able to mitigate this issue.
These photos with snow on the ground show the project this past winter. The last step is to finalize paving and landscaping work. Watch for new summer photos of this project soon!