Size: 20,000 SF
This project began with the preliminary design of a pre-engineering metal garage building, accommodating parking for 10 to 12 large quad-axle vehicles with implements.
Site planning also included the design of essential support facilities such as salt storage shed, fueling station, and truck scale to meet operational needs.
Following approval of the preliminary design and budget, our team developed detailed construction documents outlining all construction requirements to guide the successful execution of the project.