action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114For the City of New Berlin, Barrientos Design is designing two public works facilities: the Utilities Garage and the Streets/Parks/ Building’s Garage. Barrientos Design developed a space needs and master plan for implementing both facilities by reusing the existing sites.
The recommended plan consists of a combined Streets/Parks/Buildings Garage of 74,000 SF along with a central repair garage. The Utilities Garage is a separate 30,000 SF building which involves partial demolition of the existing structure and creating a significant addition in place.
Size: 30,000 SF
Cost: $3,050,000