action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Barrientos Design and Consulting was hired to develop a complete site master plan, building programming and the design of a 52,770 SF highway maintenance facility for Calumet County.
Site functions include: salt shed, fueling station, outdoor stock storage, cold storage building, and a truck scale. The site also has a rain garden for storm water management.
Building functions include: heated storage for 29 vehicles, 4 vehicle service bays, 2 truck wash bays, welding shop, sign shop, striping shop, carpentry shop, tire storage, bulk fluid storage, parts storage, lunch room, locker rooms, and administrative offices.
Size: 52,770 SF
Cost: $8.9M
Completion: 2017