arki
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121Barrientos Design was selected by the City of Waupaca to design a new Department of Public works (DPW) facility on the site of a former sports field. The project represents a strategic relocation and upgrade on the City’s operational infrastructure.
We designed a multi-functional facility to support the City’s essential services. The new complex includes a 25-stall parking garage, a four-bay repair garage, a manual wash bay, an administrative wing, a sign shop, and a water meter testing area.
The design incorporates durable and efficient construction methods, including pre-cast structural concrete for the repair garage and pre-engineered metal building systems for the parking garage and administrative areas.