goodlayers-core
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Barrientos Design and Consulting was retained by Gogebic County to develop a preliminary design for a new highway garage. The 45,000 square foot building design includes a heated parking garage, parts storage, truck wash, repair garage, a county board room and administrative office. Natural lighting throughout the building helps to reduce operating costs and increase worker safety.
A Salt Shed with a lean-to shed offers additional storage for yard functions that are typically exposed to the elements. Landscaping berms help to create a buffer between the new building and neighboring properties.
Size: 45,000 SF
Cost: $5M