Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the arki domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Madison Gas and Electric Eastside Operations - Barrientos Design
414.271.1812

Madison Gas & Electric Eastside Service Center

Madison, WI

Size: 330,000 SF

Master planning and site analysis for a new utility service center to house the operations and yard facilities for:

  • Gas Operations
  • Electric Operations
  • Transformer Storage
  • Materials Operations
  • Fleet Operations
  • Emergency Controls Center

Your Next Project Starts Here

Fill out the form to chat with an architect