arki
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121Size: 38,200 SF
Barrientos Design provided peer review and technical design services for Pacific Gas & Electric (PG$E), one of California’s largest utility providers. As part of PG&E’s statewide initiative to modernize their power distribution and maintenance infrastructure, the Napa Service Center is one of eleven new facilities planned to support this transformation.
Our role included reviewing design work prepared by the lead architect, as well as providing input on equipment selection, layout optimization, and technical specifications. Throughout the construction phase, Barrientos Design supported the project with review of change orders, substitutions, and project close-out documentation, ensuring consistency, quality, and operational readiness.