action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Barrientos Design was hired to develop a complete site master plan, building programming, and design for a 52,770 square foot highway maintenance facility for Calumet County in Chilton, WI.
The completed building’s diverse functions include heated storage for 29 vehicles, 4 vehicle service bays, 2 truck wash bays, a welding shop, a sign shop, a striping shop, a carpentry shop, tire storage, bulk fluid storage, parts storage, a lunch room, locker rooms, and administrative offices.