goodlayers-core
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Barrientos Design & Consulting assisted with building a new fleet repair maintenance facility with an administration wing for the City of Sun Prairie.
The facility, with a steel frame and pre-cast panels, covers 15,000 square feet including a mezzanine overlooking the one-story garage.
The administration wing includes lockers, bathroom facilities, washers and dryers, and a lunchroom and training space for staff.